Takt Planning: Lean Construction Scheduling With the Production System® & Last Planner® (The Art of Builder, Band 10)
Preise von
ALLE WEBSHOPS VERGLEICHEN
(2)
Amazon
Takt Planning: Lean Construction Scheduling With The Takt Production System® & Last Planner® (The Art of the Builder, Band 10)
Weiterlesen
52,92
Hervorgehoben
|
€ 52,92 |
Zum Shop
|
|
€ 52,92 |
Zum Shop
|
Beschreibung
Amazon
Takt Planning: Lean Construction Scheduling With The Takt Production System® & Last Planner® (The Art of the Builder, Band 10)
Takt Planning: Lean Construction Scheduling With The Takt Production System® & Last Planner® (The Art of the Builder, Band 10)
Preise zuletzt aktualisiert am: